Section X:
INSPECTION AND TESTING GENERAL POLICY SAMPLING PLAN RECEIVING AND FINAL INSPECTION A rejected product report must be delivered immediately to an inspection supervisor for proper disposition. A copy of the rejected report shall also be delivered to the Quality Assurance Department. The rejected material is not accepted for shipment and corrective action is required from the manufacturer. The Quality Assurance Department shall produce periodic performance reports to be reviewed and discussed at "Quality Control Committee" meetings. Such meeting shall assist vendors in improving their production processes in order to avoid future problems. SPECIAL NOTE INSPECTION AND TEST RECORDS |